While Mr G was here, he pointed out that this house also has a huge, long living room, only half of which was actually being used. The largest vacant space was against a north-facing set of windows which is catching the sun now the light is lower. He suggested the loom would get more use over a longer day there. The only problem was, it was through two sets of doors down a small flight of stairs and it was warped with a half-woven warp. And being a Glimakra, much of the frame is held together by nothing more than gravity and good engineering. And the loom is significantly larger than any of the doors we had available to move it through.
However, in the spirit of experimentation, we measured spaces and checked them twice, then moved the castle and beater to the back of the superstructure, carefully tying all of the heddles, beater and shafts, then lay it on its side. From there we slackened the warp (essential to rotate the castle and base around the doors), carefully rotated the loom castle first then base second, out one sliding door, through the garden to the other end of the house and through another sliding door. A bit of shuffling, and lo: a loom with a view.
It's by the fire, it gets the sun for half the day and it's under down lights for weaving at night. It's going to be a good spot as we come to the shortest day of the year.I hadn't been sure we'd be able to do it and had been prepared to cut the existing towels off and rethread the warp if anything went wrong, but in the end there was not a single broken warp thread - even the tension was fine.
This warp is the stash-busting warp I put on the lok to balance it while rebuilding it, and to celebrate the move I spent part of Saturday weaving the other 2/3 of it, in the sun. I now have six new tea towels requiring hemming and finishing.




